0%

Book Description

This is the first in a must-have series of step-by-step guides to using the new RIBA Plan of Work 2013 on your project. Drawing together Stages 7, 0 and 1 this book is about much more than briefing; it guides you through the brand new Stage 0 – Strategic Definition – as well as how Stage 7 – In Use – can feed into the definition process reflecting the circular principles of the new Plan of Work.

Providing a practical tool to running an efficient project each guide follows the same format leading you through the core tasks at each stage supported by tips, definitions, templates and useful techniques. Five theoretical scenarios are used throughout the guides to illustrate how the Plan of Work can be applied on various project types and sizes including an extension to a house, a new library and a large office building.

These guides will provide unrivalled support for practices on all projects – large and small – and across all types of procurement.

Table of Contents

  1. Cover
  2. Title
  3. Contents
  4. Copyright
  5. Foreword
  6. Series editor’s foreword
  7. The authors
  8. The series editor
  9. Acknowledgements
  10. The scenarios
  11. The in-text boxed features
  12. The RIBA Plan of Work 2013
  13. Introduction
  14. 01 STARTING STAGES 7, 0 AND 1
  15. 02 STAGE 7 IN USE
  16. 03 STAGE 0 STRATEGIC DEFINITION
  17. 04 STAGE 1 PREPARATION AND BRIEF
  18. 05 CONCLUSION
  19. Plan of Work glossary
  20. Index
18.119.104.238