0%

Book Description

This is the second in a must-have series of step-by-step guides to using the new RIBA Plan of Work 2013 on your project. Drawing together stages 2 and 3 this book explains the importance of the Concept Design and Developed Design, how to achieve a balance of creativity and method and how it should interact with the briefing and construction phases.

Providing a practical tool to running an efficient project each guide follows the same format leading you through the core tasks at each stage supported by tips, definitions, templates and useful techniques. Five theoretical scenarios are used throughout the guides to illustrate how the Plan of Work can be applied on various project types and sizes including an extension to a house, a new library and a large office building.

These guides will provide unrivalled support for practices on all projects – large and small – and across all types of procurement.

Table of Contents

  1. Cover
  2. Title
  3. Contents
  4. Copyright
  5. Foreword
  6. Series editor’s foreword
  7. The author
  8. Acknowledgements
  9. The series editor
  10. The scenarios
  11. The in-text boxed features
  12. The RIBA Plan of Work 2013
  13. Introduction
  14. 01 STARTING STAGES 2 AND 3
  15. 02 STAGE 2 CONCEPT DESIGN
  16. 03 STAGE 3 DEVELOPED DESIGN
  17. 04 CONCLUSION
  18. Plan of Work glossary
  19. Index
18.119.104.238