APPENDIX 8: ITDR PLAN

<Organization>

IT disaster recovery plan

<Version>

<Date of approval and publishing>

Scope

The disaster recovery (DR) plan covers the following areas:

  • <List all systems and infrastructure by the plan>.

Objective

The objective of the IT disaster recovery plan is to assist <organization> in recovering the IT services and infrastructure as required within the business continuity plans.

Team structure

Image

contact list

Image

Roles and responsibilities

Team leader

  • Assist in assessing extent of damage to IT facilities and its ability to provide a data processing service to critical business users.
  • Determine the recovery plans to be invoked, based on the current status assessment and approval from the business continuity (BC) team leader after the disaster.
  • Determine alternative team members and other support members of the recovery process.
  • Notify recovery teams of disaster declaration immediately.
  • Coordinate all recovery teams.
  • Authorize the recovery teams to provide access to the alternative site for relocation of the DR teams and state recovery actions required.
  • Report to BC team leader on the status of the recovery effort.
  • Manage and monitor the overall ITDR process.
  • Continue to provide support services to business users at the DR location.
  • Determine the priorities and schedule to initiate normalcy restoration activities with approval from the BC team leader.
  • Coordinate normalcy restoration with the BC team leader and other BC teams.

Network team

  • Establish a user/system network by establishing connections and arrangements for the server room.
  • Coordinate with the ISP to provide the means for wide area network links.
  • Re-establish local area networks, access to network resources and the overall end-user connection at the system recovery site.
  • Re-establish data and voice communications and access to these facilities.
  • Provide ongoing support for data and voice communications and oversee communications integrity.
  • Participate in and perform normalcy restoration activities.
  • Liaise with other recovery teams to ensure an effective and timely recovery.

Hardware team

  • Prioritize the provision of hardware that may be required to support critical services.
  • Plan, coordinate transportation of, install, and maintain hardware at the alternative site.
  • Coordinate with the network and communications team to ensure hardware connectivity with local, regional, and remote locations and third-party entities.
  • Ensure that the hardware resources are sufficient to meet the processing requirements at the alternative site.

Software team

Platform:

  • Coordinate restoration of stand-alone operating systems onto the main servers.
  • Coordinate restoration of network operating systems.
  • Ensure the security policy of the network operating system is adequate and appropriate with relevant controls configured to authenticate and authorize users’ access to network resources.
  • Ensure that the active directory is set up appropriately with the required group and individual privileges and services for effective and secure access.
  • Assess the operating system for system and data integrity before release to end-users.
  • Update the DR team leader on the status of platform recovery and availability at the alternative site.

Applications:

  • Coordinate restoration of applications and data which are critical to end-users and business operations as a whole.
  • Follow documented procedures to recover all application files to a point in time as close to that of the event as possible.
  • Assess the applications for system and data integrity before release to end-users.
  • Ensure backups of applications and data are scheduled once the alternative site is active.
  • Update the DR team leader on the status of application recovery and availability at the alternative site.

End-user software:

  • Coordinate restoration of end-user software such as desktop operating systems, office and mail applications, and other tools and utilities required by users to perform the day-to-day business operations.
  • Ensure that a standard pre-approved loadset comprising applications, tools, and utilities is maintained and restored onto end-user systems for recovery at the alternative site.
  • Update the DR team leader on the status of recovery and availability of end-user applications at the alternative site.
  • Assess the software for system and data integrity before release to end-users.

Data center operators team

  • Ensure that access to the backup media is available.
  • Communicate with hardware team and network and communications team to arrange travel to the alternative site if needed.
  • Ensure availability and operation of data centers at the alternative site.
  • Ensure adequate environmental controls are available at the alternative site to operate the production system from this site.
  • Verify adequate physical security, such as access control devices for the data center, is available.
  • Verify that access to the server rooms is limited to only those authorized and that they are monitored through access logs.
  • Continuously monitor the physical and environmental controls at the data center and liaise with other recovery teams to facilitate recovery and operations at the alternative site.
  • Participate in and perform normalcy restoration activities.
  • Liaise with other recovery teams to ensure an effective and timely recovery.

End-user support team

  • Act as a support team to end-users facing issues with hardware, software, or access to the network or network resources.
  • Manage the end-user-level interfaces for incidents, problems and other end-user requests.
  • Respond to end-user requests and communicate with the hardware, software, and networking and communications team to resolve end-user requests in a timely manner.
  • Assist the hardware, software, and network and communications teams as required during the restoration and recovery process.
  • Ensure end-users have access to e-mails, applications, and shared folder data as required to perform critical business operations at the alternative site.

Backup recovery team

  • Ensure that access to the backup media is available.
  • Confirm that backup media has not been destroyed in the disaster.
  • Ensure backup media is secured and maintained until requested by the recovery teams.
  • Provide the required media to the recovery teams on a timely basis.
  • Restore backups at the alternative site for recovery and perform ongoing backups once systems are back in production at the alternative site.
  • Restore systems and data using backups available in a predetermined sequence based on the application architecture and criticality of the system being restored.
  • Schedule new pick-up point with off-site storage.
  • Initialize new tapes as needed in the recovery process.
  • Perform and schedule backups at the disaster recovery site based on business requirements and considering the available infrastructure and capacity.
  • Ensure backup tapes are sent to a new off-site location for storage.
  • Participate in and perform normalcy restoration activities.
  • Liaise with other recovery teams to ensure an effective and timely recovery.

Activities to be performed immediately after a disaster

Image

Activities to be performed during disaster recovery

Image

Relevant locations

Primary recovery site

<Address>.

<Map>.

<Other necessary information>.

<Phone numbers/e-mail addresses>.

Secondary recovery site

<Address>.

<Map>.

<Other necessary information>.

<Phone numbers/e-mail addresses>.

Disaster declaration matrix

Image

Image

Recovery procedures

Prerequisites

<List all actions required to be performed before the start of the recovery process>.

Detailed recovery tasks

System

Tasks

Responsible staff

Timing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List of documents/manuals to be stored off site

  • input forms
  • user manuals
  • system manuals.

<Specific details, such as name, version and storage location at alternative site for the above documents, to be updated on implementation>.

Contact list

Image

Vendor list

Image