CHAPTER 1

image

Why Application Lifecycle Management Matters

Modern organizations depend on software and software systems in many ways. Business processes are often implemented in a digital flow and without software to support this, even small companies would experience problems. For most companies, the world has changed quickly in the last few years and they need to adapt constantly.

If you want it these days, information is available at your fingertips all the time. Remember the days back when we were teenagers? Music and movies were, and always will be, two of the top interests. This obsession started during the teen years, and we chased rare records of favorite artists and hard-to-find horror movies everywhere. When a rare vinyl pressing of a precious record from the United States was found, for instance, we were ecstatic. Not to mention the emotional turmoil when we managed to purchase a Japanese edition of the same record. Those days we wrote snail mail asking for mail-order record catalogs from all over the world, based on ads in magazines such as Rolling Stone or Melody Maker. After carefully considering what we wanted to purchase, we wrote down the purchase order, enclosed crisp bills, and sent a letter with the order inside. Then came the long wait for the package. And believe you me, this wait could be long indeed. Nowadays we just access the Internet, check some sites, and directly purchase what we want by using a credit card. The stock of many sites is so huge compared to what it was in our teens, and we can usually find what we want very quickly. In a few days the package comes, and we can start using the things we bought.

We communicate differently as well. Sites such as Facebook, Twitter, and so on have generated millions of followers, not only by the early adopters of technology, but by our societies as a whole. The numbers of smartphones (iPhone, Android devices, Windows Phone, and more), tablets, and other means of communication practically have exploded, at least in the parts of the world where the infrastructure for this is available.

With the new opportunities organizations have to do business, much has changed in the world for us, including the reality for our companies. Companies now have to deal with a global environment, presenting both opportunities and challenges. Business has changed and still is changing at a rapid pace. We need to be clear on why we develop business systems and software. For companies, development of software has changed as well. Nowadays many organizations have large development teams working on software to support the business. Many times the teams are spread globally. This poses many potential problems, such as collaboration issues, source code maintenance, requirements management, and so on. Without processes to support modern software development, business will likely suffer.

Development teams in organizations use new collaboration tools such as Visual Studio Team Foundation Server, the focus of this book. TFS, as it is generally called, is an Application Lifecycle Management (ALM) platform tying together a company’s business side with its information technology (IT) side. Application Lifecycle Management itself is, briefly, the process an organization uses to care for an application or software system from its conception to its retirement. ALM is the glue that ties together the development processes and defines the efforts necessary to coordinate the process.

Understanding the Cornerstones of Business

First let’s define the term business. What do we mean when we talk about this concept? After agreeing on this, we can reach an understanding of what business software is so we don’t talk about two different things here. When we discuss business in this book, we are talking about not only the commercial part of the company, but all the functions in the company. This means that business software is intended not only for e-commerce, but for all the functions in an enterprise.

There are three cornerstones in business system development that are important:

  • Processes
  • Business rules
  • Information

These three are dependent on each other. Think about it this way. Let’s makes an analogy with the human body. If the processes are the muscles of our company and the rules are the brain and nervous system, we can say that the information can be seen as the spine. None of them could function without the others.

Processes

A company uses different processes to support its business. For developers, project managers, software designers, or people with other roles in a development project, it is easy just to focus on the development process. We are often interested in development processes such as the Scrum process or the Extreme Programming (XP) process. The business people mostly focus on the business side of course, and have no interest in learning about the development process.

Of course, a large company needs processes for procurement, sales, manufacturing, and so on, and the development process is just one of them. The other processes are needed for the company to function and survive.

Obviously, business processes are valid not only for commercial companies but for all organizations, including those in the public sector.

SCRUM, XP, AND RUP

In case you don’t have the full picture of what Scrum, eXtreme Programming (XP), or Rational Unified Process (RUP) are, we will cover them later in this section. For now, suffice it to say that all three are development process models you can use for controlling your development efforts in projects.

Scrum is an iterative and incremental agile software development method for managing software projects and product or application development (http://en.wikipedia.org/wiki/Scrum_(development)).

Although Scrum was intended to be for management of software development projects, it can be used in running software maintenance teams, or as a program management approach.

Scrum is a process skeleton that includes a set of practices and predefined roles. The main roles in scrum are the scrum master, who maintains the processes and works similar to a project manager; the product owner, who represents the stakeholders; and the team, which includes the developers.

During each sprint, a 1530 day period (length decided by the team), the team creates an increment of potential shippable (usable) software. The set of features that go into each sprint come from the product backlog, which is a prioritized set of high-level requirements of work to be done. What backlog items go into the sprint is determined during the sprint planning meeting. During this meeting, the product owner informs the team of the items in the product backlog that he wants completed. The team then determines how much of this they can commit to complete during the next sprint. During the sprint, no one is able to change the sprint backlog, which means that the requirements are frozen for a sprint.

Extreme Programming (XP) is a software development methodology which is intended to improve software quality and responsiveness to changing customer requirements. As a type of agile software development, it advocates frequent “releases” in short development cycles (timeboxing), which is intended to improve productivity and introduce checkpoints where new customer requirements can be adopted.

Other elements of Extreme Programming include: programming in pairs or doing extensive code review, unit testing of all code, avoiding programming of features until they are actually needed, a flat management structure, simplicity and clarity in code, expecting changes in the customer’s requirements as time passes and the problem is better understood, and frequent communication with the customer and among programmers. The methodology takes its name from the idea that the beneficial elements of traditional software engineering practices are taken to ”extreme” levels, on the theory that if a little is good, more is better (http://en.wikipedia.org/wiki/Extreme_programming).

The Rational Unified Process (RUP) is an iterative software development process framework created by the Rational Software Corporation, a division of IBM since 2003. RUP is not a single concrete prescriptive process, but rather an adaptable process framework, intended to be tailored by the development organizations and software project teams that will select the elements of the process that are appropriate for their needs. RUP is a specific implementation of the Unified Process.

Business Rules

The second cornerstone is the business rules the organization needs for it to function well. The business rules tell us what we can and cannot do in the company. They also tell us what we must do. If we compare the processes to the muscles of our body, we can say the rules are equivalent to our brain and nervous system—that is, the things controlling our actions and deeds.

Information

A third cornerstone of any company is its information, that is, information about the company and what is going on in it. For example, we can have all customer information, order information, product catalogs, and so on here. Without access to relevant information at the correct time, the business will quite simply not function. Consider this example: it is impossible for a company to sell any of its products if it has no information about which products it has or what price they sell for.

Understanding the Need for Business Software

So to get back to the question about business systems and software: the reason business software exists is to support the business. Business software should take business needs and requirements and turn them into business value through the use of business software. Application Lifecycle Management is one the processes that can help us deliver this business value. And if IT people do a poor job of building this kind of software or systems by having a broken ALM process, the business will obviously suffer.

This is the reason we need to think about why we develop business software and business systems all the time (no, you do not have to think about it in your free time, even though your manager probably thinks so). We do not write software for an enterprise to fulfill our technological wishes alone; we write it to make the business run smoother and create more value (see Figure 1-1). This does not, however, make it less cool or interesting to learn new technology or write smarter code. Fortunately, these are important parts of any software or system.

9781430243441_Fig01-01.jpg

Figure 1-1.  The reason we write business software is to turn business needs and opportunities into business value

Today’s Business Environment and the Problems We Face

With the new opportunities organizations have for business these days, much has changed in terms of the realities they face:

  • Companies now have to deal with a global environment, presenting both opportunities and challenges. A global way of doing business means competition can come from all sorts of places. Low-cost countries such as China and India can offer many of the same products and services as high-cost countries. This is a great challenge for development organizations all over the world. Consulting firms are opening development shops in low-cost countries, and other companies use the services they provide. An organization’s internal development department may also see their work move to these countries. So no matter where we work, globalization affects us and our jobs, and competition is fierce. In order for us to handle this situation, it is essential to have control over our ALM process. Through this process, we find the support for collaboration between the dispersed teams we see these days, which can give us the competitive edge we need to face competition from others. We need to automate and fine-tune the ALM process we use in our organizations so that we can face challenges, keep costs down, and win deals.
  • This new reality has forced businesses to become more agile—ready to transform quickly to gain competitive advantages. This obviously affects the way we must architect and write business systems as well. In the ALM process, these topics are addressed and can help us achieve agility.
  • Communication has become more complex and different than previously. Production of products and services is spread over the world, and gone are the days when one industrial plant supplied everything for a company. For us in IT, this means that software development has moved to countries such as India or China and we need to handle this somehow. This is quite a challenge. Just consider the potential communication problems in a company with offices or manufacturing spread across the globe—not to mention problems with time and cultural differences.

As you can see, business processes can (and do) change rapidly. Hence, the supporting IT systems must also be ready for quick changes. If we do not have systems that allow this, business will suffer. This is one of the main reasons ALM tools such as Team Foundation Server (TFS) have emerged. Without an effective development process tied closely to the business side and supported by a set of tools, we will run into problems and risk being left behind by competitors already using such tools. And it is not only the ALM tools that are important; we need to consider the whole ALM process as well, including the way we run our development projects.

Project Health Today: Three Criteria for Success

What do we mean when we talk about project health? How can we measure this? Many surveys indicate the same criteria for success (or failure, if you are so inclined). Let’s take a closer look. There is slight variation, but these three can be said to be the main criteria:

  • Project delivered on time
  • Project delivered on budget
  • Project goals met

Let’s discuss these three a bit. Is it reasonable to use these criteria to evaluate project success or failure? I am a bit skeptical and will explain why.

Projects Delivered on Time

In traditional project models, a lot of effort is put into time estimates based on the requirements specifications. This way of estimating was (and still is) great for construction of buildings, roads, aircraft, and other traditional engineering efforts. These are the projects that traditional project management wisdom comes from.

Such projects are far more static than most software development projects. The engineering discipline is also rigorous in its requirements management process, which helps a lot. You don’t see as many changes to requirements during the process, and the ones that do occur go through a comprehensive change request process. Many companies use Capability Maturity Model Integration (CMMI) to improve their process and thus be better at controlling projects. CMMI enables an organization to implement process improvement and show the level of maturity of a process.1

CMMI can be used to guide process improvement across a project, a division, or an entire organization. The model helps integrate traditionally separate organizational functions, set process improvement goals and priorities, provide guidance for quality processes, and provide a point of reference for appraising current processes.

Based on some experiences at the Swedish Road Administration (SRA), where Joachim has been for seven years, design risks when building a road, for instance, are pretty low, design costs are small, especially compared to building costs, and so on. Here you set the design (or architecture) early in the project based on pretty fixed requirements. From this, you can more easily divide the work into smaller pieces and spread them elegantly across your Gantt chart. This also means you can assign resources based on a fixed schedule. Another benefit is that project management will be easier because you can check off completed tasks against your Gantt schema and have better control over when tasks are completed and if there is a delay or lack of resources during the process. On the other hand, if you get an engineering process wrong, lots of money has been wasted, and in the worst case, somebody has lost their life because of poor control of the process.

When it comes to more-complex building, such as a new tunnel the SRA built in Gothenburg and which was opened in 2006, things are a bit different. A tunnel of this magnitude was not something that the construction companies built every day. This made it harder for the team to estimate time and money for the tunnel. In this case, the tunnel opened at almost the estimated opening date . It differed by a couple of months as I recall, which must be considered well done because the whole project took more than five years to complete. The reason for this was that everything from risk management to change requests, and all construction-related tasks, were handled with rigorous processes.

We think that one thing that greatly differs between construction processes and software development processes is that construction workers know that if they make a mistake, somebody might get hurt or die. We in the software development industry tend not see that connection clearly, as long as we aren’t working with software for hospitals, or other such areas. This could be one reason that we haven’t implemented better processes before.

In his book Agile Software Engineering with Visual Studio: From Concept to Continuous Feedback 2nd Edition (Addison-Wesley Professional, 2011), Sam Guckenheimer calls the way of breaking down the project into work tasks a work-down approach because it is easy to see this as a way of burning down a list of tasks. This method of managing projects, he argues, is great for projects with low risk, low variance, and a well-understood design. In the IT world, you can see that implementations of standard products could benefit from this model. In such projects, you can do some minor customizations of the product, and the development effort is pretty small, especially compared to the effort put into business analysis, testing, and so on.

When it comes to IT projects with a lot of development effort, things change. The uncertainty in the projects increases because there are so many ways for things to change unexpectedly. This inherent uncertainty in complex IT projects makes it hard to estimate tasks in a correct way early on. Things happen along the way that throw aside earlier estimates.

Considering this, is it then realistic to measure a complex IT project against planned time? To really know how projects are doing, we might want to consider whether this is just one of the measurements we can use.

Projects Delivered on Budget

Much of the same reasoning in estimating the time of a project applies to estimating costs, because so much of the cost is tied to the people doing the work. But cost involves other factors as well. We have software costs, office costs, and other costs, but these are often easier to estimate than development costs, because they are fixed for the office we use for development. We can put a price tag on a developer, for example, based on that person’s total cost (including location costs,, training, administrative overhead and other overhead costs) the cost of leasing of a computer, and the cost of software licenses. This can be done in advance, and we then know that one developer costs a certain amount of money each day. Development cost, on the other hand, is harder to determine because it is harder to estimate the complexity of the system beforehand. The changes we encounter are hard to estimate in advance and hence the cost is hard to estimate as well.

Project Goal Fulfilled

This is also a tricky criterion, because what does goal fulfillment really mean? Does it mean that all requirements set at the beginning of a project are fulfilled? Or does it mean that the system, when delivered, contains the things the end user wants (and those they maybe don’t want)?

Most surveys seem to take the traditional approach: requirements are set early and never change. But what about the problems we saw with complex projects earlier? Can we really know all the requirements from the start? Something that I think everybody who has participated in a software project can agree on is that requirements change during the course of the project, period!

It might very well be that all the requirements that we knew about from the start have been implemented, but things have changed so much during the project that the users still do not think the project has delivered any value. The project could be seen as successful because it has fulfilled its scope, but is it really successful if the users do not get a system they are satisfied with? Have we really delivered business value to our customer? That is what we really should have as a goal.

All through the development process, we need to identify the business value that we will deliver and make sure we do deliver it. The business value might not be obvious from the start of the project but should be focused on during the process. A good development process and ALM process can help us achieve this.

Let’s now take a look at what factors influence project success.

Factors Influencing Projects and Their Success

As I have said, today’s enterprises face a lot of new challenges. Let’s go through some of these in more detail, starting with the most important one based on the surveys presented earlier but also on my own experience.

The Gap Between Business and IT

Let’s start with the biggest issue, which I mentioned before, as you may recall. IT managers’ top priority was better integration between the company’s business processes and the supporting IT systems. There seems to be quite a collaboration gap between the IT side and the business side, making it difficult to deliver software and systems that really do support the business. IT managers may focus on security, scalability, or availability instead of on supporting the business processes. These are of course important as well, but not the only issues IT should focus on. Business managers, on the other hand, may have trouble explaining what they want from the systems. This collaboration gap poses a great threat not only for projects but also for the entire company.

The Development Process

Let’s continue with the development process. Can this affect success? Obviously, it can. we have seen organizations that have spent lots of effort, time, and money on developing a good process. These organizations have trained both project managers and participants in RUP, XP, or any other development model they chose, and you would think all was dandy. Still, projects seem to suffer quite a lot. One reason for this might be that when a project starts, it is hard to follow the process. RUP, for instance, is often said to be too extensive, with many documents to write and milestones to meet. Let’s face it—even Ivar Jacobson himself seems to think this, considering his latest process development. If the process is seen as a problem or a burden, project members will find ways around it, and the money spent on training and planning will be wasted. The process may also be hard to implement because the tools have no way of supporting it. If we cannot integrate our development process into the tools we use to perform work, we most likely won’t follow the process. Using the process must be easy, and the tools should make the process as transparent as it can be, so that we can focus on work but still follow the process.

When we travel around Sweden talking to organizations about TFS and ALM, we usually ask what development process the organizations use. Often the answer is “the chaos model,” or “the cowboy model,” meaning they use a lot of ad hoc, often manual, efforts to keep it all going. Many say this is due to an inability to integrate their real development model into their tools, but others just had not given it a thought. These companies had hardly considered using any structure in work and if they had, the thoughts had often stayed in the heads of the developers (who quite often are the ones longing for a good process) or managers. Maybe a decision had been made to consider training staff in a model, but the company had never gotten around to it. No wonder these organizations experienced lots of failed or challenged projects.

Speaking of processes. We would say that not having a flexible development process (more on these processes in Chapter 2) most definitely will affect project success. Because business is sure to change during a development project, we need to be flexible in our process so that we can catch these changes and deliver business value in the end. I had a discussion with one of my customers about this some time ago. Most customers agree that there must be a way to make it easier to catch changes to requirements and make the system better reflect reality during the project. Otherwise, the perceived value of the project will suffer. But in this case, the IT manager was almost scared to even consider this. He argued that all requirements must be known at the start of the project and that they must remain static throughout the project. He thought the project would never reach an end otherwise. Not one single argument could break down his wall. He wanted to run his company’s projects by using the Waterfall model (see Chapter 3) as he always had. And still he kept wondering why projects so often ended badly.

Geographic Spread

With development spread across the globe and outsourced development, running projects can be very hard indeed. When development teams in a project are geographically separated, means of communication between them must exist and function seamlessly. For example, how can we share project status in an effective way, so that everybody can see how the project is going? How can we get a good, robust version control of source code and documents to function when we have long distances between teams? How can we catch changes to requirements when users, developers, and decision makers are separated?

This complexity is something that we can see in a recent project at a global company in the dental business. We have development in Sweden, Belgium, the United States, and Canada. This gives us a real headache from time to time especially when we need to collaborate or communicate. In this company we are lacking a clear strategy for how we can improve the ALM process, but we are taking steps to get the whole process going. So far, the improvements are pointing in the right direction so we have decided to continue the project.

The complexity in this takes its toll on scrum masters, product owners, and traditional project managers, and on the projects themselves. Tools and processes must be in place supporting the project teams. Obviously, both time and cost can be severely negatively affected by this fact. If we do not catch requirements changes, fulfillment of project scope (or the perceived added value of the project) will most likely suffer as well, making the project one of the challenged, or in worst cases abandoned, in the statistics.

Synchronization of Tools

Numerous times we have seen situations where a developer (or other team member) must use several tools to get the job done. This poses a problem for developers especially if they work in team(s). A single developer might not have these problems. There is one tool for writing code, one for bug reporting, one for testing, one for version control, one for reports and statistics, and so on. We are sure you recognize this as well. The coordinating effort to keep all information in sync between these systems is immense. Not to mention the difficulties of implementing a development process in all of them, if this is even possible in all systems.

Resource Management

What about Project Portfolio Management, or PPM, as it is also known (see Figure 1-2)? Keeping track of all running projects and their resources can be a considerable problem for enterprises. The investments in applications and projects are enormous, whether from a financial perspective or from a human capital perspective. PPM helps organizations balance the costs and values of IT investments so they can achieve their business goals.2

9781430243441_Fig01-02.jpg

Figure 1-2.  ALM and PPM

Forrester says, “PPM provides a fact-based process for evaluating, prioritizing, and monitoring projects. PPM unites the process of strategic planning, resource and budget allocation, project selection and implementation, and post-project metrics.”3

This basically says it all about what issues are covered by PPM.

We can also see that a great portion of IT investments are focused on custom application development. If we cannot manage the resources we have at our disposal, the projects will most definitely suffer. We need to know, for example, that Steve will be available at the time he is needed in our project according to our project plan. If he is not, the schedule might have to change and the project most likely will be affected by both time and cost increases. To make matters worse, tasks depending on Steve’s work might suffer as well. This issue is one of our customers’ top priorities now. A lot of the questions we get when speaking about TFS implementations concern resource management integration with TFS.

Project Size

Project size could also affect the outcome of the projects. This is perhaps no surprise, because complexity usually increases when project size increases. It is hard to manage a project that has many people involved or a long timeline. If you combine a large project size with geographically spread project teams or members, keeping it all from falling apart becomes harder, and it will be harder to foresee everything that can happen. Of course all software development is difficult and involves risks, but these factors tend to make it harder and riskier.

When discussing this topic with coworkers, many have views and opinions, but not that many can reference research directly. They seem to argue on a gut feeling. So let’s take a look at what the research indicates.

Project Success in Research

This section covers some of the research on project success over the years. You will see a well-known report from the Standish Group as well as some disagreement with this report. You will also see what the Swedish IDG has found and some research from ACM.

The Standish Group

The Standish Group performs a survey on a regular basis on the performance of IT projects in the United States and Europe. The first report in 1994 was quite famous. It showed that many IT projects were cancelled or severely challenged. Since then, the Standish Group has performed the survey several times.

In 2009 the figures looked like this4:

  • 44 percent of projects were challenged (53 percent in 1994).
  • 24 percent of projects failed (31 percent in 1994).
  • 32 percent were successful (16 percent in 1994).

Figure 1-3 presents these figures in graph form.

9781430243441_Fig01-03.jpg

Figure 1-3.  The Standish report from 2009 shows figures from 1994 and forward

The figures have improved a little over the years, but still many projects seem to be unsuccessful in some way. In 2009 the results showed a marked decrease in project success rates, with 32 percent of all projects succeeding, which means delivered on time, on budget, and with required features and functions. Projects challenged were 44 percent which means they were late, over budget, and/or with less than the required features and functions and 24% failed, which means cancelled prior to completion or delivered and never used (http://www.standishgroup.com/newsroom/chaos_2009.php). These values have improved in the 2011 report as well. But to lump failed and challenged IT projects into the same bucket is not quite correct. Just because a project is challenged does not mean it has not added value to the company. A project might be late or overrun its budget, but still deliver great value to the company which makes it a well-received project anyway. Keep this in mind when you see figures like the preceding ones mentioned. A little perspective on the figures does not hurt.

Before we leave the Standish report, let’s look at what it says about the reasons for project success. These are interesting no matter whether you believe in the actual success figures of projects. Here are the Standish Group’s top ten reasons for project success5:

  • User involvement
  • Executive management support
  • Clear business objectives
  • Optimizing scope
  • Agile process
  • Project manager expertise
  • Financial management
  • Skilled resources
  • Formal methodology
  • Standard tools and infrastructure

These are interesting reasons. Keep these reasons in mind when you read about TFS and ALM later in the book. We will also come back to some of them later in this chapter.

Robert C. Glass

The figures from the Standish Group have been challenged by other researchers. Robert C. Glass wrote an interesting article that questions where the data of the Standish report really comes from.6 He also questions the methods used by the Standish Group. Glass asks us to stand back and ask ourselves two things:

  • Does the report represent reality?
  • Is it supported by research findings?

Glass asks these questions because many other academic studies and guru reports in this area reference the Standish report from 1994. However, these other studies do not present much new material to support the old findings, according to Glass. Another problem is that the Standish Group does not describe its research process or indicate where their data came from so that we can discuss its validity. This is of course a huge problem.

Size and Volatility Survey

We want to address another survey before moving on. This survey claims that 67 percent of all projects are delivered close to budget, schedule, and scope expectations—quite the opposite of the preceding findings.7 Of the 412 UK project managers in the study, they on average overshot budget by 13 percent, schedule by 20 percent, and underdelivered on scope by 7 percent. These figures are considerably lower than the Standish Group findings.

Table 1-1 shows the performance variance of the five types of projects defined in this study. Table 1-2 shows the size characteristics of these project types.

Table 1-1. Performance Variance

image

Table 1-2. Size Characteristics

image

These figures are interesting, but the following findings are even more so. What the following three figures show is that size matters. Figure 1-4 shows that the size of the project directly affects the outcome. The more effort in terms of person-months we have in a project, the greater are the chances of failure or low performance.

9781430243441_Fig01-04.jpg

Figure 1-4.  Person-months

Figure 1-5 shows that the duration of the project also impacts performance.

9781430243441_Fig01-05.jpg

Figure 1-5.  Project length

The longer the project, the greater the risk. Note that it seems like the greatest risk comes when the project duration reaches over 18 months.

Figure 1-6 illustrates the risk of project failure based on the size of the team.

9781430243441_Fig01-06.jpg

Figure 1-6.  Team size

The risk seems to be the greatest when we have a team size of more than 20 people. Below that, we see that risk is pretty much the same. Compare this to the writings of Fred Brooks and his mythical man-month concept. In his book The Mythical Man-Month: Essays on Software Engineering (Addison-Wesley,1975) the central theme is that “adding manpower to a late software project makes it later” and you see that team size can pose a problem.

To be counted as a low performer, the following three project categories applied:

  • Abandoned
  • Budget challenged
  • Schedule challenged

The size and volatility survey further showed that changes to project targets affected the success rate as well. The more changes, the bigger the chance of being a low performer.

Conclusions

So what do all these figures tell us? Well, we can clearly see that projects are not carried out in the most optimal way. There are still too many challenged and abandoned projects in this day and age. No matter which survey we choose to believe, the figures are worrisome.

If our ALM process is flawed, most of our projects will suffer. The reason why we should take control of the ALM process is that we can deliver better projects; having an overall process helps us. And with this process comes a mindset focused on the application from its birth as a business need to the delivered business value.

Measuring project success or failure is complicated. We need to take this into consideration when we read surveys stating that this or that many projects succeed.

The importance of an overall ALM process is that it can help us control the project outcome better in the end, enabling us to deliver true business value.

The work-down paradigm mentioned earlier has a widely accepted iron triangle showing the relationship between time, resources, and functionality (see Figure 1-7).8

9781430243441_Fig01-07.jpg

Figure 1-7.  The iron triangle

In this we can imagine quality as a fourth dimension, giving us a tetrahedron. In this model, the relationship between the vertices of the tetrahedron is fixed. If you stretch one, at least one other needs to be stretched. If more resources are needed, for example, you might need to stretch time as well, and so on. With complex projects, the scope usually changes unpredictably during the process and suddenly we might need to add more resources, which obviously affect the schedule.

We need to reflect on the results of the surveys before we take them as the truth. This does not mean that the surveys we have referred to are without value. They definitely tell us something is wrong with the way we perform IT projects today. Why do so many IT projects fail? Have we not learned anything from the past years? The IT industry has been around for quite some time now, and we should have learned something along the way, shouldn’t we?

Could it be because the problems we need to solve just keep getting harder and harder? Or is it so hard to estimate and plan for projects that we can only take an educated guess at the beginning of a project? If the latter is true, why do we still measure a project’s success based on time, money, and requirements fulfillment? Maybe we should just shift our focus to business value instead? If the business value is greater than the cost of implementing the solution, time and money (cost) for the project are usually of less importance.

IT Budget Spending

In many companies that we have seen, the better part of the IT budget is usually spent on operations and maintenance and not on new development. The implications of this are that organizations have fewer possibilities to enhance their IT systems, and instead just spend the budget on keeping the systems alive. This could be a problem because the IT budget is needed to develop systems for meeting changes in the business processes.

Development vs. Operations

In 2006, the Corporate Executive Board (CEB) published the results of a survey concerning IT spending.9 The survey found that of all IT spending in 2006, 30 percent related to IT system development. That might sound like a big part of the cake, but consider where the rest of the money is spent: 70 percent of an IT budget is spent on operations and maintenance (Figure 1-8).

9781430243441_Fig01-08.jpg

Figure 1-8.  IT spending in companies

These figures are confirmed time after time in my discussions with customers. One of my coworkers told me that when he worked as an IT manager at a large Swedish car manufacturer, the figures applied as well.

Is it really rational to spend 70 percent on operations and maintenance? Wouldn’t it be more interesting to try to switch around these figures? Imagine the possibilities of adding value to an organization with so much more money to spend on IT systems. And think about the cool new features we could try out when we might have a larger budget for testing new technologies. I say we can switch around these figures (see Figure 1-9) without increasing the total IT budget or lowering the quality of operations and maintenance. This is definitely not an impossible task, which we hope this book will show.

9781430243441_Fig01-09.jpg

Figure 1-9.  Making the switch

Before we get into a discussion about how to take control of our ALM process, let’s look at some of the factors influencing this split of IT money.

Factors Influencing IT Spending

During a recent visit to one of the biggest mail order companies in Northern Europe we learned a few things that are not so uncommon in many companies. They had managed to change their IT budget spending to 30 percent operations and 70 percent development. When asked what one of the most important solutions they had used to accomplish this was, the IT manager said that they had just simply stopped making small changes or fixes to the existing systems. The cost involved in such changes was far too great, so only very important changes were allowed to be implemented. With greater traceability and automated unit testing, he said, they could have continued lowering operation costs.

One other cost driver for maintenance and operations is the retirement of an application or system. Raise your hand, everyone, who has actually planned for this event (okay, you in the back, you can take your hand down now). If this scenario is not planned for in the beginning of an application’s lifecycle, great surprises can occur in its end. One example is from my friend, the car manufacturer. At times his business had to retire applications because the specific platform running the application became obsolete or a new version of the application was developed. Support for the platform might end because of newer platforms replacing it. On some occasions, my friend found that there was no way to migrate the historical data in the application(s). This scenario had not been planned for earlier and suddenly posed a great problem. The car company then had to negotiate an extended support contract with the platform vendor, which was way more expensive than it had been when the application was alive. It was quite ironic that they had to pay more for having access to historical data than they had when they actually used the system(s). One of the solutions to begin turning around the figures was to start planning for application retirement early in the lifecycle. The ALM process was changed so that, for example, data migration was planned for, making it unnecessary to keep applications slow cooking at a great cost.

We cannot cover all cost factors in this book, but we will mention some more key issues here. A big element causing increased operation costs is the way we have traditionally built our systems (and still do build them). Some years ago, client-server solutions dominated much of our IT environment. After that came multitier applications. These gave us great opportunities in writing business systems, with scalability and availability in mind, not only as standard Windows applications but also as web applications. Joachim Rossberg and Rickard Redler even wrote two books on this topic, Designing Scalable .NET Applications (Apress, 2003) and Pro Scalable .NET 2.0 Application Designs (Apress, 2005).

If we have only a few applications, this architecture works fine, but when new applications are added, it gets complex (see Figure 1-10).

9781430243441_Fig01-10.jpg

Figure 1-10.  A traditional multitier application design. When we have several applications trying to access each other’s functions, problems may arise

Imagine what happens when a new application needs to access data from another. There are ways to solve this, as section 2 of this figure shows. We simply let the data layer of the new application access the business interface layer of the first. This way we can reuse the logic that already existed and not spread around database security and rights management. If we have only a few applications, this works fine, but as you can see in section 3, things can get pretty complicated when only a few more new applications are introduced. Most large enterprises have perhaps hundreds of applications spread across the company’s different locations. If there is no documentation task force in the company, there really is no way to have control over where the business logic is located.

Having an inflexible architecture is a great cost driver in maintenance (and of course in new projects). Imagine the nightmare of implementing a change request or bug fix in this environment. There really is no way to have control over where a change or fix will have its impact, so just a small change will need extensive testing on much more than just where the fix was implemented. This makes the cost of it much greater than it should need to be.

One way to avoid this is to have better ways of documenting traceability from the original requirement to accepted and delivered code. With the right tool(s) and the right work process, it would be much easier to find where a change or fix will have its effect, and testing could be minimized.

Another way to make the testing easier and hence less costly is to have good unit tests ready for the code and ways of running them automatically. This way, it is easier to see whether a change or a fix affects any of the code without manually testing everything else.

Another problem we have often experienced with clients is that a company has a great (and costly) infrastructure in place with redundancy for most applications and databases. Availability is high, and everyone should be happy because it’s really great to have such an environment in place. But think about it this way: is it really necessary for all applications to have such an infrastructure? Consider this: does a low-priority application not requiring 24/7 support or 99.999 percent availability need to run on such an expensive infrastructure? Isn’t it more cost-effective to run those applications on a different platform and spend the money on the systems that really need it?

Furthermore, you could cut costs if you make considerations for the time the system is expected to live. Carefully consider the infrastructure needed for all new applications. Are the requirements the same for the system with a lifespan of two years as it is for one with ten? It could be, of course, based on its business impact, but a system should not be routinely implemented on a specific platform just because you always do it like that.

How about the company operations process? Is one in place or is ad hoc work done? We are talking Information Technology Infrastructure Library (ITIL) or Microsoft Operations Framework (MOF) here. It’s just as important to have a good development process in place as it is to have an operations process. What happens when change requests come? When bug reports are entered? When new releases are introduced? Having a well-defined process in place could be a major factor in cutting operations costs. We will discuss this a bit more in Chapters 6 and 7 because it is an important topic.

With better traceability in our systems in place and tool(s) supporting it, we are certain that we could have a situation where we would not have to stop implementing small changes or features just to cut costs. If we can trace exactly where an update or bug fix will affect the system, we can make sure not to break anything else.

If we also consider our system architecture, we could create a better structured environment where we could more easily see how changes affect the system as well. Converting slowly but steadily to a SOA would be a good start.

Before we leave this chapter, we want to discuss the gap between IT and the business side again. If the business processes and the IT systems are not well aligned, there will be problems when processes change. This is a little bit like what we saw earlier with the application mess we can end up in. It is hard to say where we need to make changes to our systems when new processes need to be implemented or old ones change, if we do not know the structure of our systems. A lot of the costs involved in this process unavoidably end up in the operations budget.

Summary

An alarmingly large portion of IT projects delivered today are challenged or, in the worst case, abandoned. Many projects have overruns in terms of cost and time. Projects are also criticized for not delivering business value, and hence are not what the customer expects them to be in the end. One of the risks is definitely the lack of integration between the business side and the IT side. This gap makes it harder to deliver what we should deliver in our project, which is business value. Having a development process that is ill-defined or not even used is another great risk. Furthermore, the lack of mature ALM tools makes it harder to deliver as well, especially because we have more geographically dispersed development or project teams these days. Considering the amount of money spent on these projects, we can be certain lots of it is thrown away because of these challenges.

We can also be certain that much of our companies’ IT budgets go into operations and maintenance, giving less money to develop better and more-efficient systems that give more value to the business. To the technology-interested, this means less money and opportunity to try new cool techniques or tools, less testing of new technology, and so on. For the business, it means less opportunity to earn money and add value to the company. Either way you choose to see it, this model for IT budget spending is definitely a great problem.

The problems addressed in this chapter can be greatly improved by having control of our whole ALM process. This process, as you will see in the next chapter, focuses on taking the business needs and requirements, and turning them into business value for the organization. ALM does so by enforcing a process on how we work when developing software.

This book will show you how, with the use of a set of tools, Team Foundation Server (TFS), we can take control of the ALM process. The result will be that we can reduce the impact of the problems presented in this chapter. We might not get all the way with the current versions of TFS, but we can certainly come a long way.

Now it’s time to look more closely at the ALM concept in itself. Chapter 2 will cover most aspects of the ALM concept and why it is more than the software development lifecycle only.

1 Software Engineering Institute, “What Is CMMI,” http://www.sei.cmu.edu/cmmi/index.cfm.

2 Kelly A. Shaw, “Application Lifecycle Management and PPM,” June 2007, www.serena.com.

3 Craig Symons with Bobby Cameron, Laurie Orlov, Lauren Sessions, Forrester Research, “How IT Must Shape and Manage Demand,” June 2006, www.forrester.com/Research/Document/Excerpt/ 0,7211,39660,00.html.

4 The Standish Group International, “Chaos Summary 2008.”

5 Deborah Hartmann, “Interview: Jim Johnson of the Standish Group,” 2006, www.infoq.com/ articles/Interview-Johnson-Standish-CHAOS.

6 Robert C. Glass, “The Standish Report: Does It Really Describe a Software Crisis?” August 2006, Communications of the ACM.

7 Chris Sauer, Andrew Gemino, and Blaize Horner Reich, “ The Impact of Size and Volatility on IT Project Performance,” November 2007, Communications of the ACM.

8 Sam Guckenheimer and Neno Loje, Agile Software Engineering with Visual Studio: From Concept to Continuous Feedback 2nd Edition (Addison-Wesley Professional, 2011).

9 Corporate Executive Board, “Application Budget, Staff, and Portfolio Benchmarks,” 2006.