[1] Benjamin S. Blanchard and Wolter J. Fabrycky, Systems Engineering and Analysis (Englewood Cliffs, NJ, 1990), Vol. 4.
[2] Edward B. Roberts, “A Simple Model of R & D Project Dynamics,” R&D Management 5, no. 1 (1974): 1–15.
[3] Sterman, John D. Business Dynamics: Systems Thinking and Modeling for a Complex World. Vol. 19. Boston: Irwin/McGraw-Hill, 2000.
[4] James M.Lyneis and David N. Ford, “System Dynamics Applied to Project Management: A survey, Assessment, and Directions for Future Research,” System Dynamics Review 23, no. 2–3 (2007): 157–189.
[5] Qingyu Zhang and William J. Doll, “The Fuzzy Front End and Success of New Product Development: A Causal Model,” European Journal of Innovation Management 4, no. 2 (2001): 95–112.
[6] http://www.c2es.org/federal/executive/vehicle-standards/fuel-economy-comparison
[7] Project Management of GFE Flight Hardware Projects. EA-WI-023. Revision C, January 2002. Retrieved August 12, 2014 from: http://snebulos.mit.edu/projects/reference/International-Space-Station/EAWI023RC.pdf
[8] Robert Shishkoand Robert Aster, “NASA Systems Engineering Handbook,” NASA Special Publication 6105 (1995).
[9] B.J. Sauser, R.R. Reilly, and A.J. Shenhar, “Why Projects Fail? How Contingency Theory Can Provide New Insights–A Comparative Analysis of NASA’s Mars Climate Orbiter Loss,” International Journal of Project Management 27, no. 7 (2009), 665–679.
[10] Klaus Ehrlenspiel and Harald Meerkamm, Integrierte produktentwicklung: Denkabläufe, methodeneinsatz, zusammenarbeit (Carl Hanser Verlag GmbH Co KG, 2013).
[11] D.T. Jones and D. Roos, Machine That Changed the World (New York: Simon and Schuster, 1990).
[12] K. Yang and B. El-Haik, Design for Six Sigma (New York: McGraw-Hill, 2003), pp. 184–186.
[13] J. Freire and L.F. Alarcón, “Achieving Lean Design Process: Improvement Methodology,” Journal of Construction Engineering and Management 128, no. 3 (2002), 248-256.
3.145.12.3