Installing blade servers into a chassis

The installation and removal of half-width and full-width blade servers is almost identical, with the only difference being that there's one ejector arm in a half-width blade server, whereas in a full-width blade server, there are two ejector arms. Only the B460 M4 blade server requires two full-width slots in the chassis with an additional Scalability Connector to connect two B260 M4 blade servers and allow them to function as a single server. The bottom blade in this pair serves as the master and top blade as slave. The process is as follows:

  1. Make sure you are wearing an ESD wrist wrap grounded to the chassis.
  2. Open the ejector arm for a half-width blade or both ejector arms for a full-width blade.
  3. Push the blade into the slot. Once it's firmly in, close the ejector arm on the face of server and hand-tighten the screw.

The removal of a blade server is the reverse of the preceding process.

In order to install a full-width blade, it is necessary to remove the central divider. This can be done with a Philips-head screw driver to push two clips, one downward and the other upward, and sliding the divider out of the chassis.
..................Content has been hidden....................

You can't read the all page of ebook, please click here login for view all page.
Reset
3.128.226.255